
Engineer
Mining industry
Share profile
Languages
Russian
Skills
Project Management
Design
Organizational skills
Negotiation
AutoCAD
MS Project
Energy
Documentation development
Work experience - 27 years
Transportation | Electrician |
---|---|
Experience: Not specified | Maintenance and repair of electrical equipment. Responsibilities include servicing complex equipment, ensuring proper operation of electrical systems, and maintaining lighting and power tools. |
Mining industry | Author Supervision Specialist |
---|---|
Experience: 4 years | Author supervision of electrical and low-current networks with field design functions during the construction of a large industrial facility. Work included oversight of various engineering sections and systems. |
Construction | Specialist |
---|---|
Experience: 1 year | Organize work in accordance with developed and approved plans. Development of plans for operating organizations. Development and verification of technical specifications for work on electrical installations, electrical equipment, and systems. Development of technical conditions for the design and connection of systems. Verification of technical specifications issued by organizations. Verification of defect lists prepared by contractors. Participation in the preparation and coordination of defect acts for faulty equipment. Conducting a technical and economic analysis of cost indicators for offers. Analysis of estimates and calculations, analysis of pricing. Organization and conduct of procurement processes. Verification and confirmation of performed work. Conducting monitoring of installations and equipment. Verification of design and working documentation for compliance with regulations and technical documents. Implementation of control over the quality of work performed by contractors. Control of the quality of supplied materials and equipment. Control of the correctness and completeness of tests of equipment and systems. Acceptance of hidden works during construction and repair. Participation in the work of the commission for acceptance of completed work. Verification of as-built documentation. Preparation of reports on work performed and activities. Preparation and submission of reports based on inspections. |
Engineering | Specialist |
---|---|
Experience: Not specified | Specialist in the field of "Power Supply" within the Design and Engineering Department. Responsibilities included evaluating technical solutions, preparing documentation for equipment procurement, selecting and assessing equipment, participating in negotiations with suppliers, contributing to technical discussions, managing project timelines, and generating reports. Also involved in the production of electrical equipment based on design documentation. |
Construction | Specialist |
---|---|
Experience: 3 years | Organization of work in accordance with developed and approved plans. Development of plans for operating organizations. Development and verification of technical specifications for work on electrical installations, electrical equipment, electrical and low-current systems, automation and dispatching systems. Development of technical conditions for the design and connection of power supply systems. Verification of technical conditions issued by energy supplying organizations. Verification of defect lists for low-current systems, metrological equipment and instruments, automation systems, dispatching systems and power supply systems, prepared by operating organizations and contractors. Participation in the preparation and coordination of defect acts for faulty and out-of-order equipment. Conducting a technical and economic analysis of the cost indicators of proposals for all types of installation work on electrical equipment, electrical installations, electrical and low-current networks, automation and dispatching. Analysis of estimates and calculations, analysis of pricing. Organization and conduct of tenders. Verification and confirmation of the volumes of work performed. Conducting monitoring of electrical installations, electrical equipment, electrical and low-current networks. Verification of design and working documentation in the field of power supply and low-current systems for compliance with requirements. Implementation of control over the quality of work performed by contractors and operating organizations. Quality control of supplied materials and equipment, availability of supporting documentation. Control over the correctness and completeness of testing of electrical equipment, power supply systems and low-current systems. Acceptance of hidden works during construction and repair works. Participation in the work of the commission for acceptance of completed work. Verification of as-built documentation. Preparation of reports on completed work and activities. Preparation and provision of reports on the results of inspections of structural subdivisions. |
Construction | Engineer |
---|---|
Experience: 1 year | Organization of work in accordance with developed and approved plans. Development of plans for operating organizations. Development and verification of technical specifications for work execution. Development and verification of technical conditions for the design and connection of power supply systems. Verification of technical conditions issued by energy supplying organizations. Verification of defect lists for systems, equipment, and networks prepared by contractors. Participation in the preparation and coordination of defect certificates for faulty equipment. Conducting a technical and economic analysis of the cost indicators of proposals for installation work. Analysis of estimates and calculations, analysis of pricing. Organization and conduct of tenders. Verification and confirmation of the volumes of completed work. Conducting monitoring of systems, equipment, and networks. Verification of design and working documentation for compliance with technical requirements and standards. Implementation of control over the quality of work performed by contractors. Quality control of supplied materials and equipment. Control of equipment and systems testing. Acceptance of concealed works during work execution. Participation in the work of the commission for acceptance of completed work. Verification of as-built documentation. Preparation of reports on completed work and activities. Preparation and submission of reports on the results of inspections of structural divisions. |
Energy | Chief Engineer |
---|---|
Experience: 2 years | Organization of electrical infrastructure at facilities. Coordination of specialists' work in regions. Development of technical documentation. Personnel selection. Responsibility for electrical infrastructure. Verification of knowledge of electrical safety. Preparation of work plans and schedules for operation and maintenance. Organization of electrical equipment maintenance. Conducting negotiations. Ensuring the procurement of materials and tools for the electrical service. Calculation of the economic feasibility of participating in projects. Preparation and maintenance of reporting documentation. Key achievements: • Organization of the electrical service at the facility. • Organization of the electrical measurement laboratory. • Confirmation of qualifications in the field of electrical safety. • Servicing facilities at a large event. |
Energy | Department Head |
---|---|
Experience: 1 year | Organization of work of the department for the development of design and working documentation. Planning, distribution, and control of work execution between department specialists according to the project schedule. Collection of initial data for design work. Author's supervision. Conducting negotiations. Preparation of technical documentation. Defense of design solutions in expert bodies and during project approval. Preparation of internal reporting documentation. Development of sections of design and working documentation. Search for contracting organizations to perform electrical work. Task setting for the contracting organization, control of deadlines and quality of completed work. Key achievements: • Development of design and working documentation for an energy infrastructure facility. Modernization of existing equipment. During the implementation of the project, the power delivery scheme was revised, the distribution device was reconstructed, the generator compartment was reconstructed with the installation of new equipment. Working documentation for the reconstruction of own needs was also developed, and a control panel project was completed. During participation in author's supervision and commissioning works, sections of distribution devices were put into operation. The work was carried out in the conditions of an operating enterprise, without prolonged equipment downtime. A current conductor was used to connect the equipment. • Development of working documentation for an industrial construction facility. • Development of design documentation for a mining and metallurgical complex. Electrical equipment from well-known manufacturers was used in the projects. |
Construction | Chief Engineer |
---|---|
Experience: 3 years | Data preparation for design and survey works, including cost definition and distribution among project participants, and preparation of schedules for the development of design and estimate documentation. Ensuring the formation of the project development team, task assignment, and control over development deadlines. Preparation of assignments for organizations performing design and survey works, ensuring they have the necessary data and resolving arising issues. Coordination of work across the entire project complex, ensuring the timely issuance of complete documentation and control over the expenditure of funds. Timely resolution of issues related to design and arising during project implementation. Coordination of documentation with supervisory authorities and interested organizations. Confirmation of compliance with regulations and standards. Justification of design decisions in expert bodies and during approval. Performance of author's supervision and monitoring of the progress of works. Maintaining records of labor costs and providing data to management. Preparation of commercial proposals and tender documentation. Participation in the collection of initial data. Preparation and coordination of technical specifications. Control of project implementation schedules. Making changes to design and estimate documentation. Development of documentation for the reconstruction and construction of facilities. Passing examination and obtaining positive conclusions. Development of documentation for the modernization and reconstruction of facilities. Development of documentation for the reconstruction of heat supply systems. Performance of engineering surveys and preparation of data for construction. |
Energy | Engineer |
---|---|
Experience: 1 year | Design Engineer specializing in power electrical equipment. Responsibilities included developing technical specifications, gathering initial data, and independently creating design documentation. Tasks involved coordinating technical solutions, ensuring consistency across project components, submitting projects for review, and providing oversight during implementation. Utilized equipment from leading manufacturers. |
Mining industry | Specialist |
---|---|
Experience: 1 year | Evaluation of technical solutions, preparation of technical specifications, selection and evaluation of equipment, participation in negotiations with suppliers, participation in design meetings, maintenance of project schedules and reporting. |
Construction | Electrician |
---|---|
Experience: Not specified | Electrician for repair and maintenance of electrical equipment, Grade V (Technical maintenance and repair of heavy machinery. Travel to business trips. Organization of power supply at the construction site. Repair and maintenance of electrical equipment.) [2006 - 2006] |
Energy | Chief Engineer |
---|---|
Experience: 1 year | Responsible for construction, installation, and repair of power lines according to project specifications. Involved in the installation and connection of substations to power lines. Prepared documentation for bidding processes. Participated in discussions and negotiations. Prepared documentation for reporting purposes. |
Production | Engineer |
---|---|
Experience: 1 year | Supply organization of products for the needs of a production enterprise. Analysis, processing, and optimization of product procurement requests. Negotiation with suppliers. Analysis of commercial offers. Receiving products in the warehouse. Receiving products from suppliers. Document preparation. Participation in product inventory at the warehouse. Maintaining reporting documentation. |
Mining industry | Electrician |
---|---|
Experience: 5 years | Maintenance and repair of electrical equipment. Current repair of electric motors. Installation, commissioning, and startup of controlled drives for electric motors. Maintenance and repair of complex process equipment. Performance of duties requiring specialized electrical expertise. Acquisition of related skills and certifications in electrical safety. |
Military | Head of Engineering |
---|---|
Experience: 3 years | (After graduating from the military department at the university, he was drafted into the Armed Forces of the Republic of Kazakhstan for active military service. Initially, he managed a team. In 1998, he was appointed to a leadership role. During his service, he mainly dealt with ensuring the functionality and sustainability of the unit.) [1996 - 1999] |
Education
Finished | x1 | PGU / Energy |
Finished | x1 | Educational institution / Construction |
Finished | x1 | Saint Petersburg Institute of Power Engineering / Energy |
Languages
Russian